Thank you for your patience while we retrieve your images.
Taken 21-Oct-13
Visitors 1


3 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1153
Original file size1.87 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken21-Oct-13 11:06
Date modified21-Oct-13 12:52
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D300
Focal length135 mm
Focal length (35mm)202 mm
Max lens aperturef/5.7
Exposure1/1000 at f/5.6
FlashNot fired
Exposure bias0 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 400
Metering modeCenter-weighted average
Digital zoom1x

Tribune photo by Whitney Riggs/ A resurfacing project on U.S. 50 in Seymour, also known as Tipton Street, may cause some slow downs for motorists over the next couple of weeks. The project was awarded to Dave O'Mara Contractor Inc. of North Vernon.