Thank you for your patience while we retrieve your images.
Taken 9-May-16
Visitors 0


8 of 9 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3696 x 2456
Original file size2.25 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken9-May-16 09:56
Date modified14-May-16 22:58
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D4S
Focal length165 mm
Focal length (35mm)165 mm
Max lens aperturef/2.8
Exposure1/250 at f/9
FlashNot fired
Exposure bias-1/3 EV
Exposure modeAuto
Exposure prog.Normal
ISO speedISO 500
Metering modeCenter-weighted average
Digital zoom1x

Tribune photo by Aubrey Woods / Workers with Milestone and ABC Cutting Contractors began removing the concrete deck of the Sand Creek bridge on U.S. 31 at the Jackson County line with Bartholomew County on May 9. Milestone is the general contractor for an $8.4 million project to replace the bridge and two nearby culverts during a 240-day closure of the road.