Thank you for your patience while we retrieve your images.
Taken 1-Apr-14
Visitors 1


4 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 2179
Original file size1.47 MB
Image typeJPEG
Color spacesRGB
Date taken1-Apr-14 10:12
Date modified1-Apr-14 11:00
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length32 mm
Focal length (35mm)32 mm
Max lens aperturef/2.8
Exposure1/800 at f/9
FlashNot fired
Exposure bias-1/3 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 250
Metering modeCenter-weighted average
Digital zoom1x

Tribune photo by Aaron Piper/ From left, Seymour Department of Public Works employees Daniel Croquart, Tim Peacock, Wayne Stradley and Chad Dixon spread concrete as they repair the foundation of a portion of Lee Boulevard on Tuesday. The city is making repairs to several roads in Seymour until the streets can be paved.