Thank you for your patience while we retrieve your images.
Taken 1-Apr-14
Visitors 1


5 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1860
Original file size1.46 MB
Image typeJPEG
Color spacesRGB
Date taken1-Apr-14 10:13
Date modified1-Apr-14 11:02
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length17 mm
Focal length (35mm)17 mm
Max lens aperturef/2.8
Exposure1/320 at f/9
FlashNot fired
Exposure bias-1/3 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 250
Metering modeCenter-weighted average
Digital zoom1x

Tribune photo by Aaron Piper/ From left, Seymour Department of Public Works employees Chad Dixon, Wayne Stradley, Daniel Croquart and Tim Peacock replace the street foundation on a section of Lee Boulevard on Tuesday. The city is repairing several spots on roads in Seymour, replacing the stone and concrete foundations, until a contractor can be brought in to repave the roads.