Thank you for your patience while we retrieve your images.
Taken 30-Oct-13
Visitors 16


2 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3184 x 2120
Original file size1.63 MB
Image typeJPEG
Color spacesRGB
Date taken30-Oct-13 08:45
Date modified31-Oct-13 10:35
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length95 mm
Focal length (35mm)95 mm
Max lens aperturef/2.8
Exposure1/250 at f/5.6
FlashNot fired
Exposure bias-1/3 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 5000
Metering modeCenter-weighted average
Digital zoom1x

Tribune photo by Aaron Piper/ Workers from Bateman Builders Inc. and Shelby Materials in Seymour pour the concrete for one of the features at Seymour's future skate park. The park is being constructed in Shields Park in memory of Todd Schurman and Zach Grubb, who died in 2010 when the bike they were riding was hit by a vehicle. City officials, friends and family members were present at the concrete pouring on Wednesday.